Application guide · Factory groundwater

Review groundwater quality before selecting RO

Prepare source-water and production information to assess pretreatment, further treatment and a maintainable supply arrangement.

This page is an application planning guide. Treatment roles are illustrative and must be reviewed for your source water and required use.

Pretreatment and RO equipment shown as a groundwater application reference
Equipment photograph for reference. This guide does not describe a named customer installation.

Application requirements

A factory using groundwater needs to assess the water source and intended use before choosing treatment. A TDS figure alone cannot establish suitability for direct RO feed or describe all pretreatment risks.

Prepare representative water information

Send an original analysis report with sampling date, location and units. The review considers hardness, iron, manganese, turbidity, dissolved salts, pH, relevant microbiological information and temperature, together with source-water variation and the production use.

Separate pretreatment from desalination needs

Illustrative assessment sequence: water analysis → appropriate iron/manganese removal or filtration → hardness control or other pretreatment where required → assess whether RO is needed → storage and supply. Treatment is selected for the source and target; one arrangement is not assumed for every well.

Review the feed to downstream equipment

Confirm the water after pretreatment against the downstream equipment requirements before deciding RO and membrane protection. Provide source supply, operating schedule, backwash and drain conditions, power, storage and use-point demand.

Questions before an enquiry

Does every well require RO?

Where the intended use does not need further desalination, assess the appropriate treatment and supply arrangement for that purpose. Where dissolved salts must be reduced, review RO after suitable pretreatment.

Can I enquire without a complete report?

Begin with the source, production use, approximate demand and known operating issues. Identify missing information for the next review.

System options

Well and groundwater treatment systems →

Water-analysis information checklist →

Equipment and site scope checklist →

Read an actual project record

Use actual records to understand the source water, application and delivery scope for that installation.

Actual Senegal project with well-water supply constraints →

Send your application brief

Include country, source water, production use, required quality, daily and peak demand, site utilities and any equipment to retain. Identify missing details for follow-up.